Showing posts with label 13. Show all posts
Showing posts with label 13. Show all posts

Saturday, April 7, 2012

Why The Low H2O?


When we drained the pond on #6 down last fall we noticed the muskrat control netting had slipped down a few feet in spots and there were some burrows in the pond bank.  With everything going on this spring so far we have not had a chance to rebuild the small portion that got dug out and also install some new netting up higher on the bank.  Another issue with the pond is the gate system has rocks in the bottom of the enclosure that is preventing the bottom gate sections to seat properly and seal water off from draining out.  This coming week we will climb down and pull the rocks out, and also start to rebuild the pond bank and install new muskrat control along the pond bank.

In other news, we have been very busy tidying up the multiple projects we had left over from last fall/winter.  The tracks from the work on the irrigation pond have been cleaned up and sodded over in front of the 13th green.  The drainage on #15 & 16 has been cleaned up and prepped for seed/sod.  Some of the smaller stumps have been ground up and the holes cleaned out.  The larger ones are too big to feasibly do in-house so we will hire out their removal.  Most of the landscape beds have been cleaned out and are awaiting a fresh layer of mulch.  And to go with all of that we have already started some normal rough mowing routines and are getting closer to a regular mowing schedule on fine turf areas (kinda crazy considering it is only April 7th).

Wednesday, May 12, 2010

The Ropes Are Down


( 2010_05_12 - Hole #13 from the white tees )

Hole 13 has officially opened for play. For the most part the fairway turf is in great shape and has filled in very nicely this spring. There are still a few thin spots but once the temps really start to warm up they should fill in quickly. Until further notice, it is cart path only for the hole with no exceptions. At least for the next couple of weeks we will be following that policy, and then re-evaluate.

( 2010_05_12 - Hole 13 from the red tees)

Please obey the signage and keep the cart traffic off the grass. Also, don't forget to grab a seed bottle when you grab your club to go take your next shot. We will continue to do some seeding and topdressing in the thinner spots, but with some warm weather the turf will really start to fill in on its own.

Monday, April 19, 2010

Hole 13 Update

( 2010_04_19 - Hole #13 from the White Tee )

Hole 13 is shaping up very nicely. The cut on it today really shows the definition and contrast between the rough cut and the fairway cut. The fertilizer has really got the grass going so it will be on a regular mowing routine from here on out it looks like. There are some thinner areas, we will be seeding them in some fashion over the next few days. We are also planning on getting some seed worked into the poor fairway spots that we have on #3, 14, & 17. The weather has done nothing but cooperate for getting 13 going strong out of winter, and I am very optimistic we will be playing on it sooner then projected. Just so you know, June 1st was the projected date. Obviously it is a day by day decision, but by May 1st we should have a pretty good handle on a projected opening...

Monday, April 12, 2010

Greening Up

( 2010_04_04 - Hole #6 )

Things have definitely greened up over the last week to two weeks. Leaves are even starting to emerge on some trees. There is no question that things are a little ahead of schedule this year, and that is a great thing.

Over the next couple of weeks we will be making it around to the few damaged spots we had in some fairways and the 16th green. Roughing them up and getting some seed and soil mix worked into them. To continue the theme of natural stone work we will be removing the wooden steps on the second tee and replacing them with ones like 9 and 16. We will also be doing some work around 16 with the cart path near the green and some drainage at the bottom of the hill. We have started the bunker cleanup and edging, taking notes on ones that need some sand added, and cleaning up the grass faces that have accumulated sand over the last season. The old style bunkers did not have a lot of that problem associated with them. With the newer bunkers and the high grass slopes we are realizing we need to do a little more maintenance to keep the turf in good shape. We are putting together a game plan and will have it worked into our normal routine shortly so we can keep the grass slopes in those problem areas in tip top shape.

The thirteenth fairway is coming along nicely. It has been mowed once and fertilized all ready. You can now see what the tentative idea for fairway and rough cuts are. There will be an intermediate cut also, like most other holes on the course. With the fertilizer and mowing, once things warm up, it should really take off and start filling in. Stay tuned...

Friday, April 2, 2010

First Full Mowing 2010

( 2010_04_01 - Mowing #8 fairway )
No April fools joke yesterday, we mowed fairways, approaches, collars, and tees for the first time this season. It really is something having weather like this April 1st, it is probably 3 weeks ahead of schedule. It is forcing us to rethink our timing on some of the fertilizer and chemical apps. Though I think we will have a cool down to more normal temps this time of year, we are definitely ahead of the curve so far.

( 2010_04_01 - #13 fairway from the forward tee )
Thirteen fairway is coming along very nicely with the warmer weather we are having. This picture was taken yesterday and the fairway is even greener today. If the trend continues we will be fertilizing it early then I had anticipated and should be mowing it for the first time pretty soon. I am very optimistic that we will be on it sooner then I had thought, which was ballparked at June 1st. Here is hoping the weather continues on its warm trend and things don't get too wet with spring showers.

Tuesday, March 16, 2010

Signs of Spring

( 2010_03_15 - #18 Green Surround - Snow Mold )

Ten days ago I was showing you 2 feet of snow on the greens and throughout the golf course, oh what ten days has done to things. Now we are about 80% open and the rain is falling. So far what I have seen has me very optimistic that the course came through the winter in great shape and we just need the temps up to get things growing. With the extensive snow cover for the entire winter season we have a lot of Gray Snow Mold in the rough areas where we do not chemically treat to prevent it. As you can see from the picture of the 18th green surround, it is abundant. And from what I have seen around town, home lawns are showing the same thing. When things warm up a bit a good hand raking in these areas will bust up the gray cotton looking mycelium and aid in a quick recovery. As for the treated areas, the turf looks healthy and free of disease.


( 2010_03_15 - #13 Fairway )

I have been a little apprehensive all winter wondering how #13 fairway was going to look coming out of winter. Last October was not kind to us at all with regards to trying to grow anything from seed, especially the extent of an entire fairway. We had great germination of both the ryegrass and more importantly the bluegrass, but once the rains and cooler weather moved in the new seedlings really slowed their growth. Much to my relief, it appears we are starting the season better then I expected. The turf is very thin, but even with as wet as it is I was able to walk on it without too much of a problem. There are a lot of areas with a good stand of turf. I have a couple of plans in place for fertilizer depending on the weather, but what we really need is a quick spring with warm temps to get the turf growing and filling in the open spots. Where it is struggling the most is the approach area, the shade from the trees lining the left side really hindered the germination by keeping things cool and wet. A couple of options for the really poor areas would be overseed or sod, as things progress during the next month or so we will make a decision and put the plan into action.

Monday, December 7, 2009

Tree Trimming


Well things have opened up a little on #15, I am sure this bit of tree trimming will please many of you. The staff has been doing a lot of trimming over the last couple of weeks and capping it all off for the season is the work that was done on #15 today. We had Landberg's Tree Service trim up a few of the oak trees along the right side of the fairway, including removing the major branch that hung low over the approach area. They also cleaned up some of the oaks next to #6 tee and a couple of ash trees to the right of #5 approach. All in all a good days work for the guys.

With the approaching winter weather it looks as though we are about done with all the course work and will concentrate on equipment and other shop duties for the remainder of the snowy months. We again surrounded the course with snow fence to help deter any wayword snowmobilers, and we also have a handful of the greens covered like last year. Everything went into winter looking really good, considering the October weather we had even #13 fairway looks good. I can say right now that it will probably be a early June opening for that hole because of the weather we had, and we will do everything we can in the spring to make it playable as soon as possible. Is it possible to be on it earlier, yeah anything is possible, but I would guess it won't be the case... We'll see in the spring.

Overall, we had another excellent year at IVGC. The weather was dry until October, but that just meant more days to golf. The turf took the drought really well, and the irrigation system played a huge roll with that. Our projects went smooth, other then the delay on #4,7, & 8. The grounds crew did a super job from top to bottom in keeping the place in great shape, my thanks to them for a job well done. There are still a few turf issues lingering that we need to address going into 2010, along with some drainage problems in a couple of areas. We are currently planning some of the smaller projects for next season, and the greens committee is always looking for input on what members think should be addressed.

I hope everyone has a good winter, and a happy holiday season. I will continue to update the blog with what is going on around the shop and course. So stay tuned...

Thursday, October 8, 2009

Busy Couple of Weeks



Maia and I had our baby on Sept. 25th. Clara Maria Knox was born around 4:30pm and she weighed 8lbs. 7ozs. So needless to say the last couple of weeks have been busy and full of joy. Everyone is healthy and doing great.

The cold snap we are going through is slowing things down a bit on the course. We are not mowing everything on a regular basis right now because of the slow growth and not to mention wet weather we have had. Since last Thursday we have had about 5 inches of rain total and the golf course is plenty saturated. To top it all off the leaves are starting to fall and we are now beginning leaf patrol, trying to keep things as clean as we can. A couple things about the wet weather is that leaves do not blow away very well nor mulch up worth a hoot.

Over the next week or so we will start removing trees around #4 tee box in preperation for the renovation project that should be starting soon. The steps and flagstone path are in on #9 tee, we just have some work to do regarding the path and firming up the mulch so it is not so rough to drive on. Thirteen fairway is coming along, even with the weather lately. So all in all things have been coming together this fall so far, and right around the corner is tree trimming.

Tuesday, September 22, 2009

Seed Germination


On Sunday I noticed a few shoots on thirteen fairway, on Monday a few more, and today there is definitely a green tint to large portions of the fairway. We seeded it Last Wednesday so everything we see right now is Ryegrass, but by the end of the week we should definitely see the bluegrass germinating. The mix was roughly 80% premium bluegrass and 20% perennial ryegrass, and so far it is coming along as planned. Here's hoping for a long fall that allows us to get a good stand of grass before winter sets in...

Friday, September 18, 2009

Heat, Water, & Seed


The renovation on number thirteen was completed on Wednesday. Now with a some help from the weather things will be in good shape going into winter. We used erosion control blankets around the four catch basins and the approach area to prevent as much erosion as we can if we should get a heavy rain. The bunker surrounds were sodded also for this reason, especially concerning the steeper faces and mounding. We used a 80% premium bluegrass/20% ryegrass mix of seed, so we should see some seed germination in under a week. All in all the project went very smooth and the weather helped out a lot, save for the lack of rain at the end but once we got the irrigation up and running it didn't matter.

From what I have seen over the last couple of days, people are obeying the signs and staying out of the roped area if their ball should find its way onto the dirt. This is critical, one being the muddy mess that would be created and two the disruption in the seed bed would create "dirt" footprints as germination starts to take place. So thank you for your cooperation in this matter.

On another note. Greens aerification went great and after a week and a half the greens are looking very good. The greens should be back in tip-top shape shortly. We are about half way through aerifying the fairways and the tees will be done next Tuesday and Thursday.

Saturday, September 12, 2009

Watering Dirt


What a busy ten days since my last update. All the greens have been aerified, and about half the fairways are complete. Tees are on the agenda for this coming week, along with finishing up fairways. And number thirteen is shaping up very well. All the irrigation is in and everything is working. The soil was so dry and hard that we needed to get the water turned on before any bunker work or seeding could take place. I have been watering the dirt heavily for the past couple of days trying to get the subsurface moist and start to melt down some of the harder clumps that would not break up. Monday is the big for finishing up the bunkers and getting one last grade on the fairway. Seed and sod will be finished up Monday and Tuesday, and it looks as though the weather will cooperate...

Just a reminder about aerifying... We mow greens every other day for about a week or so following plugging. We want as little stress on the turf as possible so we can get a speedy recovery. Tees are similar, and because of the soil content we need them to be dry before we can mow them after aerifying so the mowers are out in the afternoon. We try and disrupt play as little as possible during these critical cultural practices and we appreciate everyones understanding. In a couple weeks the greens should be back to normal and weather permitting there will be a bunch of days left for some golf.

Tuesday, September 1, 2009

Renovation Continues...


A lot of grading has been done, the bunkers are roughly shaped in, and today the main drainage basins and tile are being installed.

Saturday, August 29, 2009

Renovation Is Underway


Renovation on #13 began on Friday. It should take 7-10 days to get everything graded, seeded, and bunkers built. Here's hoping for a great stretch of weather to get the new fairway established...

Friday, August 28, 2009

I stitched together a couple of snapshots I took of the clouds that rolled in this morning over the golf course, right before we got dumped on for about 5 minutes. Thankfully it was not enough rain to delay the project on #13 any longer. The bulldozer and tiller are now working on it as I type this. We've made the hole a par 3 for the time being, with the tee box located about 125 yards out on the left side of the cart path. We will be keeping the hole cut on the right side of the green to keep it as playable as possible. We may readdress the location once the fairway is seeded, because at that point there can absolutely not be any traffic on it while the seed is being established. Overall I think it works out well, and everyone can play to the green rather then a situation where a temp green is involved.

Tuesday, August 25, 2009

Rain Delayed

I wonder what the people driving by the club think when they look out over 13 and 14 and see a dead fairway? After a good couple of days over the weekend the RoundUp has worked through the plant and the turf is checking out. I did spray it again with diquat on Sunday night after the club championship to burn it down quicker and Monday was a good weather day for that. Then Tuesday brought the rain and it looks as though the project will be delayed for a couple of days because it needs to be drier for the tiller and scraper.

We have also worked out a deal with Hartman that will get the project on 7, 4, & 8 completed this year also. We are currently working on scheduling and details for that. Stay tuned for a update of what's going on in regards to that and also the progress on #13.

Tuesday, August 18, 2009

IVGC Championship Week

We are almost off and running so to speak. The club championship starts tomorrow with the 18 hole women's division playing their back 9 round. So far everything is going smooth and the course is in great shape, the IVGC maintenance staff is doing a terrific job getting the place ready for the busy week. I took a photo of the blue heron on #6 today, not much to see on #13 fairway yet. I expect it will be a few days before we notice a difference in color. The good weather we are having should really help the RoundUp make it through the plant quick.

Last night the greens committee met to discuss and approve a plan for the renovation project on #7, 4, & 8. The gist of that plan is as follows: The bunkers on #7 will be renovated to bring them up to date. The first fairway bunker on the right will be taken out, and the second one on the right will be moved up towards the 100 yard marker. The Silver Maple will be taken out in that area to allow for proper playability and mounding around the bunker itself. The left fairway bunker will be tweaked slightly but mainly just be renovated in its current location. The green side bunker will built up similar to the one on #10 green so it is more visible from further out in the fairway. It will be slightly smaller and brought towards the approach a little bit. The soil for the project will come from re-grading the approach at about 60 yards out up to the green. This will create the much needed drainage in the area for growing a better stand of grass. It will also improve the site line up the left side of the hole, there is no plan to remove any of the ridge or right side of the fairway to open up that site line. The main reason being that it would take a very significant cut to open that view up and it would create a very manufactured looking golf hole. It would be something that would look very different to the character of the rest of the golf course. To go along with #7 we will be completely renovating the 4th tee and the back tee on 8. Using some of the soil from 7 and by cutting down the front 1/3 of #8 tee we will create enough soil to increase the size of #4. Number eight will have two separate tees instead of the single tee currently there. There is some potential to also add a little length in that area, possibly 10 yards or so. The white tees would then rotate between the new lower tee and the raised back tee. #4 will enlarged to the right, over the existing cart path, also better aligned with the golf hole. To remove the need for a retaining wall, the tee will be lowered slightly so a walkable slope can be created from the new cart path which will run below the current site of the water cooler and seed box. The committee decided to also include steps similar to #16 in the project to tie it together with #9 and 16, plus make it a little easier to get to the top. The two tee complexes will be separated by a narrow buffer zone of some type of ornamental, whether it is grasses or shrubs that is yet to be decided. It will allow groups to be aware of other groups and perhaps be more courteous to each other while teeing off. So the project is planned, and the board is currently negotiating with Hartman to see if we can get the work done in this calender year... Stay tuned.

Monday, August 17, 2009

PGA Championship

Last week I was getting up at 3:55am and making my way out to Hazeltine National GC by 4:30am so I could start mowing tees around 5:00am. And then of course making it back to Island View mid morning to get my day of work in. Gruelling is not really how I would describe it, it was more just getting up an hour earlier then normal and going to bed a couple hours earlier then normal. We were fed well for our efforts, and the daily pass to the course with a parking permit was pretty sweet. What really topped it off though was standing inside the bleachers (that row of white shirts behind Y.E. and Tiger) to see them play 18 and watch the PGA Champion be crowned. Now that was a cool experience, and one hell of a approach shot by Mr. Yang.

All in all it was very exciting being part of the crew that prepped the golf course for the tournament. My hats off to Jim Nicol and his staff for a tremendous job getting Hazeltine ready for the PGA. Even after 6" of rain fell and washed out every one of the 117 bunkers on the golf course, it looked amazing by Monday morning of tournament week. I was paired with one member of the Hazeltine staff and together we mowed tees on holes #1, 6, 9, 11, 15, & 16. When we finished cleaning our mowers it was time for breakfast, and that was it. It took a total of 2 hours for the entire golf course to be cleaned up and mowed each morning. I didn't get a count on the number of volunteers there were helping but to give you an idea: there were 6 walk mowers for tees, 8-10 walk mowers for greens, 8 fairway mowers, 3-4 tri-plex fairway mowers, 4 walk mowers for approaches, 4 rollers with a guy cleaning up behind them each, a handful of guys stimping greens, a handful of guys changing and painting cups, I think two bunker crews of 8-10 guys each hand raking bunkers, 4 large debris blowers cleaning off tees/fairways/rough, and a bunch of other guys making sure everything was going smooth. A small army is basically what it was, and that was just in the morning. The afternoon crew did the majority of the course cleanup, more mowing, and many other odds and ends jobs.

It truly is amazing seeing what goes on behind the scenes of a major tournament, and to think this happens 4 times a year and perhaps a little scaled back every normal tournament weekend of the year! It was a great week to say the least.

And on a side note, I sprayed RoundUp on the 13th hole today. No picture needed 'cause it's still green as can be. We kept all traffic off it until 1:00pm so there would not be any tracking off the target area. When the plans for #7, 4, and 8 are more set I will pass them on to everyone...

Wednesday, August 12, 2009

Getting Ready!

We are getting ready for a couple of things over the next week. The Club Championship starts on Wednesday the 19th so we are giving everything that little extra shine. And the renovation project on #13 starts the following Tuesday, so we are prepping some things for that also. As noted in the picture, we have removed the willow tree next to the pond, and today we took down the two ash trees next to the fairway bunkers. The stumper should be in Friday to get everything chipped so we have plenty of time to get things clean before next week. On Monday of next week we will be spraying round-up on the 13th fairway in preparation for the renovation project. By championship weekend everything sprayed should be turning yellow and dying. This should not have any significant impact on play but mainly be a aesthetic issue. The goal is to have everything dead by Tuesday the 25th so Hartman can grade and till everything together without spreading live weeds and poa annua throughout the fairway.

To go along with the renovation on #13 this year, the 2010 renovation plans are taking shape quickly and could be tied into this year also. We plan to finish the front 9 bunkers by completing hole 7 and also completely renovating #4 and #8 tee complexes. The greens committee and board of directors are currently working together to come up with the final renovation plan and the proper financing method to get it done in this calender year. The BOD and GC feel that it is preferable to have everything done at the same time so next spring we are not digging into something and dragging out the renovation projects into the summer. The club is also hosting the MGA Senior 4-Ball championship next September so the other window for renovation would be October, which is still not being counted out... But if we can get 2010's renovation work done this year, it would mean no major construction work until 2011. And I think everyone would be on board for a nice long season (2010) without construction and renovation projects taking place. It also gives the GC plenty of time to come up with a solution for the renovation of #14 which includes soil sampling, pond, bunkers, and fairway work.

Stay tuned, I will update the blog on a daily basis starting next week to show off the championship and also the renovation progress.

Monday, July 27, 2009

Didn't Find Any Gold, Yet.

Curbing is done on #11 and #7, and the sod/grading is also completed around those areas. The new teebox on #11 is now open for play. The blue MGA marker is now 207 yards to the middle of the green, we will be updating the tee sign soon. Two of the three buildings on the course are cleaned up and painted. #9 tee is next on the list for some work, the new steps and landscape area. We will be doing more sodding along some cart path edges and evaluating some of those areas for stone rather then grass. The geese are now flying and are much easier to keep away from the course. We will do everything we can to keep them away for the rest of this season and also deter them from staying around next spring. All in all we have been busy taking care of a lot of odd's and end's.

The finishing touches for number 13 in in the final planning stages right now. The next newsletter will have a overview of the project so everyone understands what is going on. I will also be updating the blog regularly as we get closer to renovation time. Right now I plan to spray the fairway with Round Up on Monday of club championship week. It will be yellowing by the weekend but should play just fine. This is necessary so when we till the entire area the week after the tournament, the grass is dead and 'crispy'. This will ensure a good final grading of the fairway prior to seeding. But, as I just said, I will keep everyone informed of the details as we get closer to the project...

Tuesday, July 7, 2009

Projects, Projects, Projects

Well we have a lot of this and that going on right now. Josh with Hartman is in for the day putting the finishing touches on the new 11th tee and also grading out the area for drainage. One of the directions we have started to go with tees and other construction type projects is getting the professionals in to do the job right. Not that we could not do the job in-house mind you, but there is added level of detail and finishing work that we can not do with our equipment. The laser level you see in the picture can make the tee perfectly flat, 1/4" slope one way or another, or put in any other slope you may want for surface drainage. The precision is a lot more exact then the simple level we use for our in-house projects.

All the sod we stripped from the area is being put to use on those eyesore spots around the cart paths and behind #16 green on the hill side. The areas we have left when we use up all the sod created will be handled with purchased sod or from the back of the driving range where we have been taking sod for various projects. The entire area around the 11th tee will be sodded along with the tee box itself, the sod coming from the beginning of the fairway.

Some of the bunkers needed a little attention so we are currently getting some weeding and edging done. Sand will also be added to a couple of bunkers where it is getting a little thin. We are also getting a much over due paint job on the #6 shack. We stripped all the loose stuff some time ago and have not had a chance to get the fresh paint on until now. When that building is done we will be moving on to the pump house and then perhaps the starter shack.

The area to the right of nine tee will also be getting a make-over soon. We need to regrade the area around the evergreens to get the standing water out of there, and also have plans for a set of steps to be installed. The current idea is to remove the planting and wall block and place the steps there where the path is already expanded. The flowers would be added to the area to the right of the path where we will be grading along with some hosta and perhaps other plant material.

There has been some talk about steps for the forward tee on #13. I would rather see golfers drive around the 12th green and past the water cooler to get to that tee. It keeps people on top of the hill rather then having to park below and climb up. We need to do a little tree trimming on the tree next to the teebox to open the area up a little, but I would guess the amount of traffic should not be a problem along the teebox. I hope this solves any problems associated with climbing the bank if it is wet and slippery.