Well, I would love to show you a picture of the completed work but I am having trouble with getting the pictures into the blog. Hopefully I will have it figured out by next time...
Anyway, the work is complete on #8 and #10. There are a few loose ends we need to tie up on our side of things but that should all be wrapped up this week. We have received nothing but great comments on the work that was done. #10 should be playable by the end of next week and #8 will probably be brought into play the Tuesday before the club championship. It usually takes a good two weeks to get the sod rooted down enough for traffic and no slipping on the bunker slopes. All the sand will be raked up to the edges before we bring them into play.
This years project consisted of #6, 8, & 10. Providing the funds are there to continue next year, we would be moving on to #7 (which would finish the front 9), 12, 13, and 18. That would about equal the amount spent on this years renovations. That would only leave #14, 15,16, & 17 left to finish off the bunker renovations. The one hole which really needs a close look is #14. The pond needs to be rebuilt, the fairway from 100 yds and in needs some serious work, and there is potential there to scrape down the fairway out as far as 250 yds so it is possible to see your second shot and what lies ahead.
No comments:
Post a Comment