Showing posts with label 8. Show all posts
Showing posts with label 8. Show all posts

Monday, November 15, 2010

Course Close, First Snow

( 2010_11_15 - First snow cover #4 green )

And the season has come to a screeching halt, 8-9 inches of snow will do that I suppose. I left on Friday afternoon thinking  Monday morning would be a good day for some pictures and updates on the projects and course as we head into winter. Well, I can show you winter, and that is about all. There is not 8 inches of snow on the course, but there is at least a few still. The heavy wet snow did provide some great moisture for all the new sod we just put down. The total for the current project was over 5,000 yards, some regular height rough grass and some 1.25" premium blue.

We had everything pretty well done before this first snow volley hit. Tee markers and some odds-n-ends supplies are still being picked up today, but for the most part that is it. All the chemical applications were finished up on Friday, and that is usually the most important thing going into winter. We did not get any covers down on the greens. We have enough covers left for about a half dozen greens to be covered, the same number as last winter. As many of you know we have been phasing out green covers over the last 5 years, so to possibly not have anything covered this winter is just an acceleration of the plan in place. When I started there were 14 greens covered, over the years as the mats have deteriorated we have not replaced them and are down to about 6 greens worth of covers.

Some of the things we have done over the years to strengthen the plant and protect the turf going into winter that will not be covered has been: fall foliar fertilizers high in potassium which helps harden off the plant for the winter months and a thicker sand topdressing which helps in protecting the crown of the plant. This winter we had planned to use a turf paint which would help protect against desiccation if there is little snow cover and spring green due to heating of the plants with the dark green color. So far it is something that golf courses in the area have just started to experiment with, and we had planned to do our own experiment with it this winter.

I still think we will have an opportunity to get some covers down and even some turf paint, but if we don't I am not overly concerned. Thanks to everyone for a great 2010 season! Let's hope for a good winter and a better 2011 season.

Wednesday, October 20, 2010

Renovations Underway

( 2010_10_15 - Approach work #7 )

The renovation work began last week on holes 4,7, & 8. A complete renovation of the teeing areas on 4 and 8, plus the bunker renovation and approach grading on 7. Because of the amount of soil we needed to properly rebuild the 4th tee and renovate the bunkers on #7, we chose to re-grade the approach area on #7. This allowed us to properly surface drain the area and open up the site-line along the left side of the hole.

(2010_10_20 - Approach work #7 after grading )

Though the pictures do not do it real justice, you can now stand back at the fairway bunker and see the rebuilt greenside  bunker and left edge of the green. The majority of the water will surface drain off to the left, and we were able to make renovating the fairway bunker on 18 very cost effective due to the soil we could generate from the approach area. The bunker on 18 has no soil to work with and everything has to be hauled in, not too mention it requires a lot of soil to do properly.

(2010_10_20 - Renovations on hole #7 )

So all in all we have another week or so of renovation work. And then it is almost November and irrigation blow-out, snow-mold chemical applications, and greens covers will be on the agenda. Oh yeah, we also have a bunch of tree trimming planned as usual.

Monday, December 7, 2009

Tree Trimming


Well things have opened up a little on #15, I am sure this bit of tree trimming will please many of you. The staff has been doing a lot of trimming over the last couple of weeks and capping it all off for the season is the work that was done on #15 today. We had Landberg's Tree Service trim up a few of the oak trees along the right side of the fairway, including removing the major branch that hung low over the approach area. They also cleaned up some of the oaks next to #6 tee and a couple of ash trees to the right of #5 approach. All in all a good days work for the guys.

With the approaching winter weather it looks as though we are about done with all the course work and will concentrate on equipment and other shop duties for the remainder of the snowy months. We again surrounded the course with snow fence to help deter any wayword snowmobilers, and we also have a handful of the greens covered like last year. Everything went into winter looking really good, considering the October weather we had even #13 fairway looks good. I can say right now that it will probably be a early June opening for that hole because of the weather we had, and we will do everything we can in the spring to make it playable as soon as possible. Is it possible to be on it earlier, yeah anything is possible, but I would guess it won't be the case... We'll see in the spring.

Overall, we had another excellent year at IVGC. The weather was dry until October, but that just meant more days to golf. The turf took the drought really well, and the irrigation system played a huge roll with that. Our projects went smooth, other then the delay on #4,7, & 8. The grounds crew did a super job from top to bottom in keeping the place in great shape, my thanks to them for a job well done. There are still a few turf issues lingering that we need to address going into 2010, along with some drainage problems in a couple of areas. We are currently planning some of the smaller projects for next season, and the greens committee is always looking for input on what members think should be addressed.

I hope everyone has a good winter, and a happy holiday season. I will continue to update the blog with what is going on around the shop and course. So stay tuned...

Tuesday, August 25, 2009

Rain Delayed

I wonder what the people driving by the club think when they look out over 13 and 14 and see a dead fairway? After a good couple of days over the weekend the RoundUp has worked through the plant and the turf is checking out. I did spray it again with diquat on Sunday night after the club championship to burn it down quicker and Monday was a good weather day for that. Then Tuesday brought the rain and it looks as though the project will be delayed for a couple of days because it needs to be drier for the tiller and scraper.

We have also worked out a deal with Hartman that will get the project on 7, 4, & 8 completed this year also. We are currently working on scheduling and details for that. Stay tuned for a update of what's going on in regards to that and also the progress on #13.

Tuesday, August 18, 2009

IVGC Championship Week

We are almost off and running so to speak. The club championship starts tomorrow with the 18 hole women's division playing their back 9 round. So far everything is going smooth and the course is in great shape, the IVGC maintenance staff is doing a terrific job getting the place ready for the busy week. I took a photo of the blue heron on #6 today, not much to see on #13 fairway yet. I expect it will be a few days before we notice a difference in color. The good weather we are having should really help the RoundUp make it through the plant quick.

Last night the greens committee met to discuss and approve a plan for the renovation project on #7, 4, & 8. The gist of that plan is as follows: The bunkers on #7 will be renovated to bring them up to date. The first fairway bunker on the right will be taken out, and the second one on the right will be moved up towards the 100 yard marker. The Silver Maple will be taken out in that area to allow for proper playability and mounding around the bunker itself. The left fairway bunker will be tweaked slightly but mainly just be renovated in its current location. The green side bunker will built up similar to the one on #10 green so it is more visible from further out in the fairway. It will be slightly smaller and brought towards the approach a little bit. The soil for the project will come from re-grading the approach at about 60 yards out up to the green. This will create the much needed drainage in the area for growing a better stand of grass. It will also improve the site line up the left side of the hole, there is no plan to remove any of the ridge or right side of the fairway to open up that site line. The main reason being that it would take a very significant cut to open that view up and it would create a very manufactured looking golf hole. It would be something that would look very different to the character of the rest of the golf course. To go along with #7 we will be completely renovating the 4th tee and the back tee on 8. Using some of the soil from 7 and by cutting down the front 1/3 of #8 tee we will create enough soil to increase the size of #4. Number eight will have two separate tees instead of the single tee currently there. There is some potential to also add a little length in that area, possibly 10 yards or so. The white tees would then rotate between the new lower tee and the raised back tee. #4 will enlarged to the right, over the existing cart path, also better aligned with the golf hole. To remove the need for a retaining wall, the tee will be lowered slightly so a walkable slope can be created from the new cart path which will run below the current site of the water cooler and seed box. The committee decided to also include steps similar to #16 in the project to tie it together with #9 and 16, plus make it a little easier to get to the top. The two tee complexes will be separated by a narrow buffer zone of some type of ornamental, whether it is grasses or shrubs that is yet to be decided. It will allow groups to be aware of other groups and perhaps be more courteous to each other while teeing off. So the project is planned, and the board is currently negotiating with Hartman to see if we can get the work done in this calender year... Stay tuned.

Wednesday, August 12, 2009

Getting Ready!

We are getting ready for a couple of things over the next week. The Club Championship starts on Wednesday the 19th so we are giving everything that little extra shine. And the renovation project on #13 starts the following Tuesday, so we are prepping some things for that also. As noted in the picture, we have removed the willow tree next to the pond, and today we took down the two ash trees next to the fairway bunkers. The stumper should be in Friday to get everything chipped so we have plenty of time to get things clean before next week. On Monday of next week we will be spraying round-up on the 13th fairway in preparation for the renovation project. By championship weekend everything sprayed should be turning yellow and dying. This should not have any significant impact on play but mainly be a aesthetic issue. The goal is to have everything dead by Tuesday the 25th so Hartman can grade and till everything together without spreading live weeds and poa annua throughout the fairway.

To go along with the renovation on #13 this year, the 2010 renovation plans are taking shape quickly and could be tied into this year also. We plan to finish the front 9 bunkers by completing hole 7 and also completely renovating #4 and #8 tee complexes. The greens committee and board of directors are currently working together to come up with the final renovation plan and the proper financing method to get it done in this calender year. The BOD and GC feel that it is preferable to have everything done at the same time so next spring we are not digging into something and dragging out the renovation projects into the summer. The club is also hosting the MGA Senior 4-Ball championship next September so the other window for renovation would be October, which is still not being counted out... But if we can get 2010's renovation work done this year, it would mean no major construction work until 2011. And I think everyone would be on board for a nice long season (2010) without construction and renovation projects taking place. It also gives the GC plenty of time to come up with a solution for the renovation of #14 which includes soil sampling, pond, bunkers, and fairway work.

Stay tuned, I will update the blog on a daily basis starting next week to show off the championship and also the renovation progress.