Showing posts with label trees. Show all posts
Showing posts with label trees. Show all posts

Wednesday, August 8, 2012

What A July, What A Wind!

How many days with 90+ degree weather so far this year? I think we are at 25 and counting. The month of July was something that is for sure. We had multiple days with soil temps at or over 100 degrees, it was a challenge keeping the turf cool. Collar areas took the brunt of the stress and there are quite a few poor spots to show it. We will be sodding a couple of the worst areas with bentgrass sod from the nursery area, and aerifying, seeding, and topdressing all the collars to help with a quick recovery. The recent cool down has been greatly appreciated that's for sure.

And now for the topic everyone has been talking about the last couple of days, the storm that blew through on the 3rd of August. Here are pictures to give you an idea of the damage and cleanup challenges we are facing right now. We hope to have 75% of the work done this week and the rest finished up by midweek next week. In all we will lose 17 trees due to the damage caused, some completely came down but many are so badly damaged that they need to come down. There are hundreds of hangers and fallen branches. Once the course is cleaned up and the hangers have been cut down we will start with the removal of the trees. A huge thanks to the members that showed up Sunday morning to help rake and pick up sticks, the effort is really appreciated by the staff. And a special thank you to Dean Geiger for the continued help he is giving us to load and remove brush from the golf course.












Tuesday, June 19, 2012

Rain Rain Go Away...

We added another 0.75" of rain to the golf course last night.  This goes with the 2.0" the night before and the 1.5" the previous Thursday.  Oh yeah, not too mention the 1.5" in the beginning of last week...  Suffice it to say, the golf course is saturated.  There were also some strong winds last night the wreaked havoc on small branches and twigs.  The grounds staff is spending the entire day today picking up debris littered all over the course.  And all this in anticipation of the next volley that is supposed to roll through late tonight.  But don't be deterred members and public golfers; The golf course is still very much playable and in great shape.

Saturday, April 7, 2012

Why The Low H2O?


When we drained the pond on #6 down last fall we noticed the muskrat control netting had slipped down a few feet in spots and there were some burrows in the pond bank.  With everything going on this spring so far we have not had a chance to rebuild the small portion that got dug out and also install some new netting up higher on the bank.  Another issue with the pond is the gate system has rocks in the bottom of the enclosure that is preventing the bottom gate sections to seat properly and seal water off from draining out.  This coming week we will climb down and pull the rocks out, and also start to rebuild the pond bank and install new muskrat control along the pond bank.

In other news, we have been very busy tidying up the multiple projects we had left over from last fall/winter.  The tracks from the work on the irrigation pond have been cleaned up and sodded over in front of the 13th green.  The drainage on #15 & 16 has been cleaned up and prepped for seed/sod.  Some of the smaller stumps have been ground up and the holes cleaned out.  The larger ones are too big to feasibly do in-house so we will hire out their removal.  Most of the landscape beds have been cleaned out and are awaiting a fresh layer of mulch.  And to go with all of that we have already started some normal rough mowing routines and are getting closer to a regular mowing schedule on fine turf areas (kinda crazy considering it is only April 7th).

Tuesday, March 20, 2012

Not Too Much Cleanup Thankfully

One casualty from the storm last night. We got about .4" of rain and I'm not sure, but I think the wind gusts were in the 50 mph range.

Thursday, September 22, 2011

When Lightning and Tree Meet


I was looking through some pictures we have taken over the last couple of months and ran across this one I though I would share. It is of a large Ash tree behind #1 green that was hit by lightning on August 22nd. The tree was hit much higher then the top of the picture but this shows all the things that happen when the moisture inside the tree expands in a instant. The bark has been blown off in streaks going up and down the trunk. The sod has been blown off around the base of the tree and along some of the shallower roots. We will be keeping an eye on the tree to see if it is going to make it, but from what we have seen in the past it should probably survive the strike, thought the quality of the tree itself is usually degraded.

Tuesday, September 20, 2011

Big Split

Here is a before shot of the fourteenth green before the tree between the pond and bunker was taken out last week. The tree canopy blends well with the background so in the after it is perhaps hard to notice the difference.






To the right is the current look of fourteen green from the other side of the pond. From an elevated position such as the fairway it is very noticeable and the area looks kind of bare now. The greens committee will evaluate the space and determine of trees are needed in the area.


The reason the tree came down is apparent in the picture to the left. The split went all the way to the ground and was a very hazardous situation. While it was evident the tree had been cracked for sometime, the separation was unnoticeable until early last week when I spotted it while painting the hazard line around the pond. This is the same thing that happened to the Ash tree on the right of the approach that we took down a couple of months ago.

Monday, August 29, 2011

September Informer


I want to start off with a huge thanks to my staff for setting up a great golf course for Club Championship. A little rain on Sunday was more annoying then anything else, but other then that the weather was terrific and the course played great. From the comments I heard it sounded as though everyone had a great weekend, even though some golf games were not that “fun”. So with the Championship behind us we are now prepping for aerification. The greens will be aerified on the 6th and 7th, the Tuesday and Wednesday right after Labor Day. Tees and fairways will follow, and like in the past, that should not disrupt play much at all. With such a slow start to the season it feels like the last 2 months just flew by and it’s hard to think about fall and getting the course ready for winter. I am sure we still have 2 good months of golf ahead, and perhaps even a decent part of November if the weather holds.

Unlike last October when we were renovating 4,7, & 18, there will be no major projects going on this fall. We have some drainage work and some curb projects to tackle, and we will definitely be continuing the tree trimming. As I mentioned last month, we will be doing some major tree work on #16 in order to create a much better environment for the green and hole in general. It will start with the removal of the Oak tree closest to the green on the front right corner. The large Oak behind the green will be drastically trimmed up this fall, as well as some major trimming along the left side with some potential tree removal there also.

With the season winding down the Greens Committee will be looking for a new member very soon, so if you are interested please let them know. There are five members on the committee with 2-3 board members also sitting in. The commitment is 5 years, we meet once a month for most of the year, and tackle issues regarding all aspects of the golf course.

Enjoy the rest of the summer,
Kurt

Thursday, June 23, 2011

2011 Renovation About To Start

( 2011_06_23 - Tree Removal Before Bunker Work )

The bunker renovations are about to continue, with only a few holes left we are almost done. Over the next week Hartman will be renovating 4 bunkers and adding 1. The 2 approach bunkers and right greenside bunker on #15 will be re-worked. The picture shows us removing the damaged Oak tree in preparation for the work, not only was it in the way for the bunker renovation project, its removal opens up the area for better turf conditions and it was almost completely hollow which is a safety issue. The other two bunkers being done consist of the fairway bunker on #2 and the addition of a second bunker a little further up from the first. As part of that work we will be removing the first two Ash trees along the left side of the fairway just beyond the current fairway bunker. Hopefully now the weather will start cooperating and allow the work to be done inside a weeks time, we are keeping our fingers crossed.

( 2011_06_02 - Deer Wandering Around #17 )

One of the joys of working on a golf course is the wildlife one sees on almost a daily basis. This young deer was wandering around #17 and #14 with another older one. It's pretty common to see a deer or two on a weekly basis. The turkeys have not been very abundant this year, but last year we counted over 20 in a flock on #16 numerous times. And of course there are always squirrels, egrets, blue herons, and various small critters. If you have been around the clubhouse in the past two weeks you are well aware of a not so pleasant critter being on the premises... Just recently 7 skunks were found living under the 4 season porch/deck area, and since have been removed. This is a first that anyone can recall of having a issue with animals under the clubhouse, but we are working to alleviate any further problems by closing up the openings that exist.

Tuesday, February 1, 2011

GCI: Trees on the golf course

( 2010_08_29 - Hole #5 from behind #16 green )


Check out this link to a little 2 minute education on some of the issues the golf course faces with tree competition.

Tuesday, April 13, 2010

A New View

( 2010_04_13 - Hole #18 )

A new look from the eighteenth tee will greet you on your next visit to the club. In an effort to make the hole more playable the two trees on the right side of the fairway nearest the tee have been removed. This greatly improves the ability to reach the right side of the fairway and not get caught up to find yourself with a 200 yard shot up hill to the green. As part of the next phase of the bunker renovation project, the bunker on 18 will be getting a makeover. This means it will be brought up to style with the other bunkers and also be brought into the fairway a little more to take it out of the tree line on the left side. The removal of the trees not only makes the hole much more playable now, but with the changes it will continue to keep the hole more playable for us average golfers.

You will also notice that we have removed the bag rack near the putting green. It was seldom used and created a traffic issue that funneled players to and from the putting green to the first tee. This should help improve movement and also turf conditions in the area. We are also in the planning stages for the new flower bed that we created when we took out all the old Juniper shrubs next to the starter shack, new shrubs for a hedge to block the loading area to the lower part of the clubhouse, and shrubs to replace the overgrown Amur Maples to the right of the first tee.

Monday, December 7, 2009

Tree Trimming


Well things have opened up a little on #15, I am sure this bit of tree trimming will please many of you. The staff has been doing a lot of trimming over the last couple of weeks and capping it all off for the season is the work that was done on #15 today. We had Landberg's Tree Service trim up a few of the oak trees along the right side of the fairway, including removing the major branch that hung low over the approach area. They also cleaned up some of the oaks next to #6 tee and a couple of ash trees to the right of #5 approach. All in all a good days work for the guys.

With the approaching winter weather it looks as though we are about done with all the course work and will concentrate on equipment and other shop duties for the remainder of the snowy months. We again surrounded the course with snow fence to help deter any wayword snowmobilers, and we also have a handful of the greens covered like last year. Everything went into winter looking really good, considering the October weather we had even #13 fairway looks good. I can say right now that it will probably be a early June opening for that hole because of the weather we had, and we will do everything we can in the spring to make it playable as soon as possible. Is it possible to be on it earlier, yeah anything is possible, but I would guess it won't be the case... We'll see in the spring.

Overall, we had another excellent year at IVGC. The weather was dry until October, but that just meant more days to golf. The turf took the drought really well, and the irrigation system played a huge roll with that. Our projects went smooth, other then the delay on #4,7, & 8. The grounds crew did a super job from top to bottom in keeping the place in great shape, my thanks to them for a job well done. There are still a few turf issues lingering that we need to address going into 2010, along with some drainage problems in a couple of areas. We are currently planning some of the smaller projects for next season, and the greens committee is always looking for input on what members think should be addressed.

I hope everyone has a good winter, and a happy holiday season. I will continue to update the blog with what is going on around the shop and course. So stay tuned...

Monday, August 3, 2009

Wee Bit of Storm Damage

Well the storm rolled through last night and took down a tree or two on the golf course. As always there is/was a lot of little stuff here and there to pick up. A Oak tree between #15 & #17 broke off about 20 feet up, it was the one that grew up all twisted. There are a couple of other trees that took enough damage (one on #3 and one on #9) that the tree will most likely be taken down. There were also a few major branches that came down but do not warrant taking the tree out. All in all, not as bad as I thought it would be when I got in this morning. We will have it back in shape in no time... One good thing is we have had about an inch and a half of rain in the last three days, much needed for as dry as its been.

I met with the landscaper (same company that put the steps in on #16) last week to plan the steps for number nine tee. The work is planned for the week of Sept. 7th and should not take more then a week. It looks as though we are going to have a very busy construction period starting right after the club championship. With the work being done on #13, the steps on #9, and then fall aerification starts right around that time also... Busy, busy, busy.

Monday, September 29, 2008

Colors Are A Changing

Fall colors have started to show up here and there, and if the vibrant colors a few trees on the golf course have shown is any indication of what to expect this fall it could be a terrific year for colors. I knew a little of why leaves change colors, and why certain years are better then others for brilliant hues, but I did not have all the details. I came across this description: http://www.na.fs.fed.us/Spfo/pubs/misc/leaves/leaves.htm and it does a good job of keeping the science in layman's terms for all of us to understand.

I am hoping this fall lasts for a while and gives us plenty of time to play golf and get some projects completed. If it is anything like this spring though it won't be around long and we will go straight into winter. Yikes, let's hope not.