Busy Fall
The front entry project has officially started in full force. Southwest Paving is now removing asphalt and will start the grading in the next day or two. Hartman has started the renovation of the first tee also, so there is a lot going on at the club right now. Projected entry project completion time is Mid October. Oh yeah, on top of all that it is aerifying time again. We completed the front nine greens today, plug-collect-sand-drag-brush-mow-water. We did not get the fertilizer down at this time because the winds were blowing 20+ mph all day, it was great for drying sand but not for spreading fert. We will get it down as soon as the winds calm and allow us to.
Labels:
aerification,
aerify,
air exchange,
clubhouse,
construction,
fall,
fertilizer,
projects,
recovery,
renovation,
weather
Tuesday, September 13, 2011
Aerifying Schedule
Last week we aerified greens, and it went about as smooth as it ever has. The weather was absolutely perfect and at a week out the greens are healing nicely. My previous post gives a pictorial of the process from start to finish, for those of you who might be interested in what it takes to go from really nice putting surfaces to something akin to putting over large holed pegboard. By this coming weekend they should be in pretty good shape.
This week we will be aerifying tees, which we started today by getting half of the driving range tee done. Wednesday and Thursday we plan to do the front 9 and back 9 respectively. And then on Friday we plan to finish the driving range tee. The process is a bit different then greens. We pull cores, pulverize them, and then drag the sand/soil into the turf canopy. The par 3 tees and some of the par 4 tees will get some seed and topdressing as part of the process also. Like the greens, we will be mowing the tees a little less frequently over the next week or so, and also waiting a little longer in the day so they have time to dry a bit and we don't track around any mud.
Fairways will follow next week and it usually takes a couple of weeks to get them all done. We use large solid tines and the disruption to play is minimal. They will also get some seed and topdressing dragged in where we feel it is needed, though they have recovered very nicely from the summer issues we had a couple of months ago.
This week we will be aerifying tees, which we started today by getting half of the driving range tee done. Wednesday and Thursday we plan to do the front 9 and back 9 respectively. And then on Friday we plan to finish the driving range tee. The process is a bit different then greens. We pull cores, pulverize them, and then drag the sand/soil into the turf canopy. The par 3 tees and some of the par 4 tees will get some seed and topdressing as part of the process also. Like the greens, we will be mowing the tees a little less frequently over the next week or so, and also waiting a little longer in the day so they have time to dry a bit and we don't track around any mud.
Fairways will follow next week and it usually takes a couple of weeks to get them all done. We use large solid tines and the disruption to play is minimal. They will also get some seed and topdressing dragged in where we feel it is needed, though they have recovered very nicely from the summer issues we had a couple of months ago.
Labels:
aerification,
aerify,
air exchange,
drainage,
driving range,
fairways,
greens,
mowing,
recovery,
seed,
tees,
topdress,
weather
Wednesday, September 7, 2011
10 Steps or so...
Pulling Cores
Harvesting Cores
Spreading Sand
Dragging Sand In
Brushing Sand In
Hand Broom And Fill Remaining Holes
Backpack Blower Cleanup
Mowing
Fertilizing
Much Needed Irrigation By Step 10
Labels:
aerification,
aerify,
air exchange,
fertilizer,
greens,
irrigation,
mowing,
sand,
topdress
Monday, August 29, 2011
September Informer
I want to start off with a huge thanks to my staff for setting up a great golf course for Club Championship. A little rain on Sunday was more annoying then anything else, but other then that the weather was terrific and the course played great. From the comments I heard it sounded as though everyone had a great weekend, even though some golf games were not that “fun”. So with the Championship behind us we are now prepping for aerification. The greens will be aerified on the 6th and 7th, the Tuesday and Wednesday right after Labor Day. Tees and fairways will follow, and like in the past, that should not disrupt play much at all. With such a slow start to the season it feels like the last 2 months just flew by and it’s hard to think about fall and getting the course ready for winter. I am sure we still have 2 good months of golf ahead, and perhaps even a decent part of November if the weather holds.
Unlike last October when we were renovating 4,7, & 18, there will be no major projects going on this fall. We have some drainage work and some curb projects to tackle, and we will definitely be continuing the tree trimming. As I mentioned last month, we will be doing some major tree work on #16 in order to create a much better environment for the green and hole in general. It will start with the removal of the Oak tree closest to the green on the front right corner. The large Oak behind the green will be drastically trimmed up this fall, as well as some major trimming along the left side with some potential tree removal there also.
With the season winding down the Greens Committee will be looking for a new member very soon, so if you are interested please let them know. There are five members on the committee with 2-3 board members also sitting in. The commitment is 5 years, we meet once a month for most of the year, and tackle issues regarding all aspects of the golf course.
Enjoy the rest of the summer,
Kurt
Labels:
16,
aerification,
aerify,
club championship,
greens committee,
projects,
renovation,
staff,
tree trimming,
trees
Wednesday, April 13, 2011
#16 Green Seeding
For the most part the golf course is in really good shape for this time of the year. We have gotten a first mowing on all the fine turf areas: tees, greens, approaches, and fairways. Things have greened up considerably in the past week, and most of the thinner areas in the fairways from snow mold damage are going to heal without much input on our part. The few greens that are damaged are a little different story however, and the seeding process is all figured out. We will not be covering #7 or #4 so we are waiting to seed them until next week when the freezing temps should be behind us. #16 got the treatment today and we have put a cover over it, taking it out of play.
( 2011_04_13 - Verticut in two directions #16 green )
( 2011_04_13 - Job Saver tines on #16 green )
We started with the verticutters and went in two directions, and followed that up with Job Saver tines in the aerifier. They create about a half-inch round dimple in the green for getting topdressing and seed into. So then we topdressed, seeded, and dragged the green. When all that was done we fertilized, watered, and covered...
( 2011_04_13 - Watering after seeding process #16 green )
( 2011_04_13 - Covering up the damaged section )
Now we just need the weather to cooperate, a quick warm up and some good growing weather. By keeping the traffic off and covering the green it will allow us to greatly speed up the process of recovery during this unfavorable time for seeding and establishment.
Labels:
16,
aerify,
covering,
damage,
job savers,
renovation,
seeding,
verticut
Saturday, September 12, 2009
Watering Dirt

What a busy ten days since my last update. All the greens have been aerified, and about half the fairways are complete. Tees are on the agenda for this coming week, along with finishing up fairways. And number thirteen is shaping up very well. All the irrigation is in and everything is working. The soil was so dry and hard that we needed to get the water turned on before any bunker work or seeding could take place. I have been watering the dirt heavily for the past couple of days trying to get the subsurface moist and start to melt down some of the harder clumps that would not break up. Monday is the big for finishing up the bunkers and getting one last grade on the fairway. Seed and sod will be finished up Monday and Tuesday, and it looks as though the weather will cooperate...
Just a reminder about aerifying... We mow greens every other day for about a week or so following plugging. We want as little stress on the turf as possible so we can get a speedy recovery. Tees are similar, and because of the soil content we need them to be dry before we can mow them after aerifying so the mowers are out in the afternoon. We try and disrupt play as little as possible during these critical cultural practices and we appreciate everyones understanding. In a couple weeks the greens should be back to normal and weather permitting there will be a bunch of days left for some golf.
Wednesday, May 7, 2008
Spring is here, and with it...
On the same note, we did core aerify the collars of all 18 greens on Tuesday. The timing could not have been better with the 1/2" of rain we received almost immediately after finishing the last green. We aerified, picked up the cores, topdressed with a sand/soil/peat mix, seeded with bentgrass, and dragged it all in. The rain was perfect for soaking the seed and "melting" the topdressing into the turf. We may also do this routine on some of the worst areas in the rough that just don't seem to want to fill in. For the few burned out fairway spots (#10 comes to mind) we will be slit seeding and topdressing those sometime this week.